Article Open Access

Line Balancing Analysis with Ranked Positional Weight (RPW) and Region Approach (RA) Methods on the Production Line at PT. Vitapharm Surabaya

(1) * Moch. Febri Sugianto Mail (Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, 60294, Indonesia)
(2) Rusindiyanto Rusindiyanto Mail (Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, 60294, Indonesia)
*Corresponding author

Abstract


Increasingly fierce industrial competition requires companies to improve the efficiency and productivity of their production processes. PT Vitapharm Surabaya faces the problem of workload imbalance in the Manual-A production line, especially in the facial serum packaging process which has an impact on low production efficiency and non-achievement of daily output targets. This study aims to analyze and improve line balancing using two approaches, namely the Ranked Positional Weight (RPW) and Region Approach (RA) methods. The data collected includes work cycle time, adjustment factors, and allowances for each work element. After the application of RPW and RA methods, there was an increase in line efficiency from 61.10% (actual condition) to 80.56% (RPW) and 84.72% (RA), a decrease in balance delay from 38.90% to 19.44% (RPW) and 15.28% (RA), and a significant reduction in idle time. The results showed that both methods were able to improve the balance of the production line, with the Region Approach method providing slightly more optimal results. This research can be used as a basis for continuous improvement in the cosmetics production line of PT Vitapharm.

Keywords


Idle Time, Line Balancing, Production Efficiency, Ranked Positional Weight, Region Approach

   

DOI

https://doi.org/10.33122/ejeset.v6i1.667
      

Article metrics

Abstract views : 526 | PDF views : 554

   

Cite

   

Full Text

Download

References


Baroto, T. (2017). Pengendalian dan Perencanaan Produksi. In Jakarta,(cetakan II). Ghalia Indonesia.

Basalamah, M. R., Azizah, H. N., Kholifah, U., & Suroso, H. C. (2021). Implementasi Line balancing pada Proses Produksi Baju Taqwa di UD . Sofi Garment Jurusan Teknik Industri , Fakultas Teknologi Industri ,. Seminar Nasional Teknologi Industri Berkelanjutan I (SENASTITAN I), 307–312.

Basuki, M., Mz, H., Aprilyanti, S., & Junaidi, M. (2019). Perancangan Sistem Keseimbangan Lintasan Produksi Dengan Pendekatan Metode Heuristik. Jurnal Teknologi, 11(2), 1–9. 10.24853/jurtek.11.2.117-126

Dharmayanti, I., & Marliansyah, H. (2019). Jurnal Manajemen Industri dan Logistik PERHITUNGAN EFEKTIFITAS LINTASAN PRODUKSI. Manajemen Industri Dan Logistik, 03(NO.01), 43–54.

Hapid, Y., & Supriyadi. (2021). Optimalisasi Keseimbangan Lintasan Produksi Daur Ulang Plastik dengan Pendekatan Ranked Positional Weight. Jurnal INTECH Teknik Industri Universitas Serang Raya, 7(1), 63–70. https://doi.org/10.30656/intech.v7i1.3305

Lestari, S. L., & Darmala, R. S. P. (2022). Penentuan Jumlah Pekerja Optimal Pada Bagian Receiving Dengan Metode Work Load Analysis (Studi Kasus Pt. Batam Aero Technic). Journal Industrial Manufacturing, 7(2), 97. https://doi.org/10.31000/jim.v7i2.6888

Mujahidulloh, M. F., & Bakhtiar, A. (2021). Analisis Line Balancing Untuk Keseimbangan Proses Produksi Antimo Tablet di PT. Phapros Semarang. Industrial Engineering Online Journal, 10(4).

Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217

Pristi, D., Afif, M., Simamora, R. K., S, F. A., & Kusuma, A. A. (2020). Merancang Keseimbangan Lintasan Produksi / Perakitan Ragum Pada Kota Makassar Menggunakan Metode Line Balancing Secara Manual dan Software. Jurnal TALENTA Conference Series: Energy Dan Engineering, 3(2), 1–8. https://doi.org/10.32734/ee.v3i2.991

Putra, B. I., & Jakaria, R. B. (2020). Perancangan Sistem Kerja. UMSIDA Press.

Rachman, T., & Santoso, C. A. (2019). Perbandingan Metode Ranked Positional Weight (RPW), Metode Largest Candidate Rule, dan Metode J-Wagon untuk Penentuan Keseimbangan Lintasan Optimal Produksi Sampel Sepatu Model SSOW. Inovisi, 15(1).

Rangkuti, M. F. F., Azizah, F. N., & Wahyudin, W. (2024). Penerapan Konsep Line Balancing Menggunakan Metode Ranked Position Weight Pada Proses Produksi Pakan Ternak PT. XYZ. Industrika : Jurnal Ilmiah Teknik Industri, 8(1), 116–124. https://doi.org/10.37090/indstrk.v8i1.1207

Sinurat, F. W., Siregar, I., Rahmadani, W., Faradita, T. A., & Harahap, R. A. A. (2023). Analisis Penerapan Line Balancing dengan Metode Ranked Position Weight (RPW) pada Sistem Produksi Kursi Rotan di CV XYZ. TALENTA Conference Series: Energy & Engineering, 6(1), 8–14. https://doi.org/10.32734/ee.v6i1.1773


Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Moch. Febri Sugianto, Rusindiyanto Rusindiyanto

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0