AbstractThe project by PT Adhi Kartika Jaya, JJ Promotion, is a high-value investment project on Jalan Kertajaya Surabaya, near the Cultural Heritage Building Viaduc Kertajaya. The project aims to install outdoor billboards with a strategic location and work hours between 00:00 WIB and 06:00 WIB. To achieve expected results, construction management over existing resource assets is crucial. The project must focus on preventing damage to cultural heritage buildings, implementing K3 (Occupational Health and Safety) aspects, and completing on time. Thorough documentation is necessary to identify vulnerable points and ensure safety equipment is used. The project is divided into two main stages: backlog/stage in the workshop and backlog/stage at the project site. After completion, the project area is cleaned and inspected to ensure safety. The project serves as a lesson for exploring broader project management knowledge, such as the Agile Method with Scrum and Kanban tools. KeywordsProject Management; Time Speed; Construction; Agile Methods; Advertising
|
DOIhttps://doi.org/10.33122/ejeset.v6i1.591 |
Article metricsAbstract views : 348 | PDF views : 104 |
Cite |
Full Text Download
|
References
J. W. Soetjipto, D. A. Adinanda, and S. Arifin, “Pengendalian Penyelesaian Proyek Berbasis Kinerja Menggunakan Hybrid Earned Value - Crash Program,” JITS, vol. 22, no. 2, p. 127, May 2024, doi: 10.12962/j2579-891X.v22i2.15996.
Andrian Firdaus Yusuf A, “Analysis of the Implementation of Bridge Construction Project Risk.” Enrichment Journal of Management, 12 vol.12, Nov. 2021, 957-964
A. W. Priambudi and A. F. Y. A. Qordhowi, “Studi Kinerja Biaya dan Waktu (Studi Kasus: Proyek Pembangunan Gedung F Poliklinik Terpadu RSUD Prof. Dr. Soekandar),” JUTIN, vol. 7, no. 3, pp. 1768–1776, Jul. 2024, doi: 10.31004/jutin.v7i3.31705.
N. A. Hidayah and Nur Muhammad Asnadi, “Penerapan Metode Agile Dalam Manajemen Proyek: Systematic Literature Review,” jupel, vol. 6, no. 1, pp. 43–53, Feb. 2024, doi: 10.32520/jupel.v6i1.2858.
Y. Alfiansah and B. Kurniawan, “Analisis Upaya Manajemen K3 Dalam Pencegahan Dan Pengendalian Kecelakaan Kerja Pada Proyek Konstruksi Pt.X Semarang,” Jurnal Kesehatan Masyarakat, vol. 8, 2020.
“Perda-Kota-Surabaya-No-5-2005-Pelestarian-Bangunan-danatau-Lingkungan-Cagar-Budaya.”
“perwali 42 Tahun 2017 surabaya.”
“Permen-Kemen-Tenaga-Kerja-No.-05-Tahun-1996-Sistem-Manajemen-K3.”
I. G. N. Putra Wijaya, N. M. Jaya, and I. D. K. Sudarsana, “Manajemen Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Pelaksanaan Pembangunan Shortcut Denpasar-Singaraja,” jsn, vol. 10, no. 1, p. 52, Jan. 2022, doi: 10.24843/SPEKTRAN.2022.v10.i01.p07.
M. Fazis, “Perencanaan Proyek Dan Penjadwalan Proyek”.
“Mengintip dasar pengembangan sistem informasi dengan metode Agile. Why Agile Rocks?,” Jurnal Sisfo Unsurya, vol. 6, no. 1, Jun. 2014, doi: 10.35968/jsi.v6i1.277.
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 Andrian Firdaus Yusuf Al Qordhowi

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.


























Download 